Proposals
Proposal pricing psychology: what optional items do to a yes
The psychology of proposal pricing comes down to one shift: a single total asks the client whether to buy, while a base price with one or two optional extras asks which version to buy. Keep the extras few, price them so the base still stands on its own, and let the client see the total change as they choose.
Nuwan Madhusanka · Co-founder
5 min read · Published
A proposal priced as one number asks the client a yes or no question. A proposal priced as a base scope plus one or two optional extras asks a different question: which version do you want? That shift is the core of proposal pricing psychology, and it is why almost every well built quote carries at least one optional line.
The 18 proposal and quote templates counted for this article all follow that pattern. Every one has at least one optional item; eight have two; none has more than two. The table above lists them. It is a small sample, but it shows a deliberate restraint: enough choice to make the client an active participant, not so much that choosing becomes work.
One number invites a no
When a client sees a single total, the only lever they have is the price itself. They can accept it, reject it or ask for a discount. When they see a base with extras, they have other levers. They can drop the extras to fit a budget without asking you for anything, or add one because it solves a problem they had not raised.
This changes the conversation after the proposal too. A follow up about a single total is “have you had a chance to look at it”. A follow up about extras is “did you want the irrigation left in”. The second is easier to answer, and it assumes the job is going ahead.
The base and the extras
The base must stand on its own. If the core scope only works with an extra added, the extra is not optional; it is a hidden part of the price, and the client will feel misled when they find out.
Good optional items share three traits:
- They are useful but separable. Drone footage on a shoot, a care plan on a website, a beverage package on catering. The job is complete without them.
- They are priced clearly. A fixed amount, or a unit price with a quantity. “Price on request” is not an option.
- They make sense to add now. An extra shoot day costs less when it is booked with the first; a safety switch is cheaper to install while the electrician is on site.
How to set each price, from cost plus to value based, is in how to price a proposal and value based pricing vs hourly.
How many options
The best known study on this is Iyengar and Lepper’s work on choice overload. Shoppers offered a display of 24 jams stopped more often than those offered 6, but far fewer of them bought anything. Nielsen Norman Group draws the same lesson for interfaces: each extra choice adds effort, and too many make people abandon the decision.
For a small business proposal, one or two extras is the practical limit. The templates never go past two. If you find yourself listing five add-ons, group them into one package or move them into a later conversation.
Order and anchoring
Psychologists describe anchoring as the tendency for an earlier number to influence how later numbers are judged. In proposals, this is often turned into the advice to show a premium option first so the standard one looks cheaper. Use it carefully. A client can spot a decoy package that nobody is meant to buy, and it costs you trust.
A more honest use of order is to list items in the sequence the work happens, core scope first and extras after, with each extra’s price beside it. The client sees the base total first and then decides what to add. That is anchoring on the price you actually want them to accept.
Ticked or unticked
An optional item can arrive ticked, so the client removes it, or unticked, so they add it. Pre ticking raises the first total the client sees, which can make the whole proposal feel expensive. It also risks the client feeling something was slipped in.
Pre tick only what nearly everyone takes and would expect, such as travel for an out of town booking. Leave genuine upgrades unticked. In OneCraft each optional item has a selected by default setting, so the choice is per item. See optional line items for how the mechanics usually work in quoting tools.
Quantity the client controls
Some choices are not yes or no but how many: shoot days, session packs, square metres of turf, downlights in a kitchen. Letting the client adjust a quantity within limits you set is another form of option. It keeps the scope in their hands without opening it up entirely.
OneCraft items can be marked quantity editable with a minimum and maximum. The client’s view shows a quantity control, the totals update as they change it, and the accepted quantity flows to the invoice. A floor protects your minimum job size; a ceiling stops a client booking more than you can deliver.
The total the client sees
Whatever the client selects, the summary should show the money honestly: subtotal, any discount, the tax line, the total, and any deposit due now with the balance. If your prices include GST, the ATO allows the invoice to say the total includes GST when GST is exactly one eleventh. The point is that the client should never discover a number after accepting.
A worked example
Stillwater Films quotes a festival video. Pre-production $1,500, two shoot days at $2,200 each with the quantity editable from two to four, editing $2,800, and drone footage as an unticked extra at $750. The base subtotal is $8,700, GST $870, total $9,570. The client adds a third shoot day and the drone: subtotal $11,650, GST $1,165, total $12,815. They chose a bigger job than the one they were quoted, and nobody had to ask.
The quote with optional extras page shows how to build this, the quotation example shows a complete quote, and pricing in a slide deck rather than a document is covered in how to present pricing in slides.
| Template | Kind | Items | Optional | Deposit |
|---|---|---|---|---|
| Bookkeeping and accounting | Proposal | 5 | 1 (backlog catch-up) | None |
| Catering | Quote | 5 | 1 (beverage package) | 30% |
| Cleaning and maintenance | Proposal | 4 | 1 (pressure washing) | None |
| Coaching package | Proposal | 4 | 2 (team workshop, extra sessions) | None |
| Construction and renovation estimate | Proposal | 6 | 1 (air conditioning upgrade) | 10% |
| Consulting engagement | Proposal | 4 | 1 (implementation support) | 30% |
| Event services | Proposal | 5 | 2 (styling, photographer) | 40% |
| Interior design | Proposal | 5 | 1 (styling day) | 30% |
| Landscaping | Quote | 5 | 1 (irrigation) | 30% |
| Marketing retainer | Proposal | 4 | 2 (short video, newsletter) | None |
| Photography and video shoot | Proposal | 6 | 2 (extra shoot day, drone) | 50% |
| Printing | Quote | 5 | 2 (hard copy proof, design amendments) | 50% |
| Repair | Quote | 4 | 1 (pickup and return) | None |
| Software project | Proposal | 5 | 1 (support retainer) | 25% |
| Trades call-out | Quote | 4 | 1 (safety switch upgrade) | None |
| Tutoring | Quote | 4 | 2 (exam intensive, second subject) | None |
| Website design | Proposal | 6 | 2 (care plan, logo refresh) | 50% |
| Wedding and celebrant services | Proposal | 4 | 2 (travel, elopement add-on) | 30% |
A finished example
A quotation template should give the price line by line, say what is and is not included, how long it stays valid and when each payment falls due. This one is filled in for Copperfield Bathrooms, quoting Alana Reid $34,780 including GST for a full bathroom renovation at 14 Selwyn Street, Hawthorn. Eight trades are priced as separate lines, the fixtures and fittings are a $7,350 prime cost allowance, the job runs four weeks from Monday 5 October 2026, and the payment schedule takes 5 per cent on acceptance, 50 per cent when tiling is done and 45 per cent at practical completion.
Read the quotation template priced trade by tradeQuestions people ask
What is good, better, best pricing in a proposal?
Three versions of the same job at three prices, such as essential, standard and premium. It works when the versions are genuinely different packages. For most custom service work, a single base scope with one or two priced extras achieves the same effect with less complexity, because the client builds the better version themselves.
Should optional extras be ticked by default?
Only when most clients take them and leaving them out would surprise the client later, such as travel on a wedding booking. A pre ticked extra raises the total the client first sees, which can make the base feel expensive. Unticked extras keep the headline price honest and let the client add value. Either way, make the choice visible.
Does showing a higher option first help sell the cheaper one?
Anchoring research suggests an earlier, larger number can shape how later prices feel, but in a proposal the effect is modest and easy to overdo. Clients notice a decoy package that exists only to make another look cheap. Order items in the sequence the work happens, and let the extras sit after the core scope.
Can the client change quantities, not just add extras?
In tools that support it, yes. OneCraft items can be marked quantity editable with a minimum and maximum, so a client can choose between six and twelve downlights or two to four shoot days. The total updates as they choose, and the accepted quantity is the one that appears on the invoice.
How should GST appear when the total changes?
Show it on the total the client actually selects. If your prices exclude GST, the summary should add GST to the selected subtotal; if they include it, say the total includes GST. The ATO accepts a statement that the total includes GST when GST is exactly one eleventh of the price.
Do optional items reduce the chance of acceptance?
Too many can. Iyengar and Lepper's study found shoppers offered 24 jams were more likely to stop but less likely to buy than those offered 6. One or two well chosen extras rarely cause that problem. If clients keep asking what an extra is for, remove it or rewrite its description.
Written by
Nuwan Madhusanka · Co-founder
Works across the builders and the export paths: how a form becomes a PDF, how a flyer canvas becomes a print file, and how a signed document carries its audit trail.
LinkedIn profileSources
Written and checked by the OneCraft team. Last checked .
Make your own proposal
Describe what you need and the generator writes and designs it, then you edit anything you like.
See what it can makeRead next
Agency proposal mistakes, and the fix for each
The proposal mistakes that hurt small agencies most are not typos or ugly layouts but commercial ones: a scope without limits, a single price with no options, no deposit, no expiry date and no record of what the client accepted. Each one either loses the job or, worse, wins it at a loss.
How to write a winning proposal
A winning proposal is the one that makes saying yes easy: it restates the client's problem in their words on the first page, prices the work as a base with one or two options, gives a date the offer runs to, and lets the client accept in one step. Length, design and adjectives matter far less than those four decisions.
How to write a business proposal
Buyers read a proposal out of order: summary, price, then whether you understood the problem. Writing for that order is most of the craft, and it changes where each section goes.
For the steps inside the builder, read the guide on this topic.