Proposals

Proposal pricing psychology: what optional items do to a yes

The psychology of proposal pricing comes down to one shift: a single total asks the client whether to buy, while a base price with one or two optional extras asks which version to buy. Keep the extras few, price them so the base still stands on its own, and let the client see the total change as they choose.

· Co-founder

5 min read · Published

A proposal priced as one number asks the client a yes or no question. A proposal priced as a base scope plus one or two optional extras asks a different question: which version do you want? That shift is the core of proposal pricing psychology, and it is why almost every well built quote carries at least one optional line.

The 18 proposal and quote templates counted for this article all follow that pattern. Every one has at least one optional item; eight have two; none has more than two. The table above lists them. It is a small sample, but it shows a deliberate restraint: enough choice to make the client an active participant, not so much that choosing becomes work.

One number invites a no

When a client sees a single total, the only lever they have is the price itself. They can accept it, reject it or ask for a discount. When they see a base with extras, they have other levers. They can drop the extras to fit a budget without asking you for anything, or add one because it solves a problem they had not raised.

This changes the conversation after the proposal too. A follow up about a single total is “have you had a chance to look at it”. A follow up about extras is “did you want the irrigation left in”. The second is easier to answer, and it assumes the job is going ahead.

The base and the extras

The base must stand on its own. If the core scope only works with an extra added, the extra is not optional; it is a hidden part of the price, and the client will feel misled when they find out.

Good optional items share three traits:

How to set each price, from cost plus to value based, is in how to price a proposal and value based pricing vs hourly.

How many options

The best known study on this is Iyengar and Lepper’s work on choice overload. Shoppers offered a display of 24 jams stopped more often than those offered 6, but far fewer of them bought anything. Nielsen Norman Group draws the same lesson for interfaces: each extra choice adds effort, and too many make people abandon the decision.

For a small business proposal, one or two extras is the practical limit. The templates never go past two. If you find yourself listing five add-ons, group them into one package or move them into a later conversation.

Order and anchoring

Psychologists describe anchoring as the tendency for an earlier number to influence how later numbers are judged. In proposals, this is often turned into the advice to show a premium option first so the standard one looks cheaper. Use it carefully. A client can spot a decoy package that nobody is meant to buy, and it costs you trust.

A more honest use of order is to list items in the sequence the work happens, core scope first and extras after, with each extra’s price beside it. The client sees the base total first and then decides what to add. That is anchoring on the price you actually want them to accept.

Ticked or unticked

An optional item can arrive ticked, so the client removes it, or unticked, so they add it. Pre ticking raises the first total the client sees, which can make the whole proposal feel expensive. It also risks the client feeling something was slipped in.

Pre tick only what nearly everyone takes and would expect, such as travel for an out of town booking. Leave genuine upgrades unticked. In OneCraft each optional item has a selected by default setting, so the choice is per item. See optional line items for how the mechanics usually work in quoting tools.

Quantity the client controls

Some choices are not yes or no but how many: shoot days, session packs, square metres of turf, downlights in a kitchen. Letting the client adjust a quantity within limits you set is another form of option. It keeps the scope in their hands without opening it up entirely.

OneCraft items can be marked quantity editable with a minimum and maximum. The client’s view shows a quantity control, the totals update as they change it, and the accepted quantity flows to the invoice. A floor protects your minimum job size; a ceiling stops a client booking more than you can deliver.

The total the client sees

Whatever the client selects, the summary should show the money honestly: subtotal, any discount, the tax line, the total, and any deposit due now with the balance. If your prices include GST, the ATO allows the invoice to say the total includes GST when GST is exactly one eleventh. The point is that the client should never discover a number after accepting.

A worked example

Stillwater Films quotes a festival video. Pre-production $1,500, two shoot days at $2,200 each with the quantity editable from two to four, editing $2,800, and drone footage as an unticked extra at $750. The base subtotal is $8,700, GST $870, total $9,570. The client adds a third shoot day and the drone: subtotal $11,650, GST $1,165, total $12,815. They chose a bigger job than the one they were quoted, and nobody had to ask.

The quote with optional extras page shows how to build this, the quotation example shows a complete quote, and pricing in a slide deck rather than a document is covered in how to present pricing in slides.

Line items, optional items and deposits in the 18 OneCraft proposal and quote templates, counted from proposals-api/src/templates on 13 October 2026
TemplateKindItemsOptionalDeposit
Bookkeeping and accountingProposal51 (backlog catch-up)None
CateringQuote51 (beverage package)30%
Cleaning and maintenanceProposal41 (pressure washing)None
Coaching packageProposal42 (team workshop, extra sessions)None
Construction and renovation estimateProposal61 (air conditioning upgrade)10%
Consulting engagementProposal41 (implementation support)30%
Event servicesProposal52 (styling, photographer)40%
Interior designProposal51 (styling day)30%
LandscapingQuote51 (irrigation)30%
Marketing retainerProposal42 (short video, newsletter)None
Photography and video shootProposal62 (extra shoot day, drone)50%
PrintingQuote52 (hard copy proof, design amendments)50%
RepairQuote41 (pickup and return)None
Software projectProposal51 (support retainer)25%
Trades call-outQuote41 (safety switch upgrade)None
TutoringQuote42 (exam intensive, second subject)None
Website designProposal62 (care plan, logo refresh)50%
Wedding and celebrant servicesProposal42 (travel, elopement add-on)30%

A finished example

A quotation template should give the price line by line, say what is and is not included, how long it stays valid and when each payment falls due. This one is filled in for Copperfield Bathrooms, quoting Alana Reid $34,780 including GST for a full bathroom renovation at 14 Selwyn Street, Hawthorn. Eight trades are priced as separate lines, the fixtures and fittings are a $7,350 prime cost allowance, the job runs four weeks from Monday 5 October 2026, and the payment schedule takes 5 per cent on acceptance, 50 per cent when tiling is done and 45 per cent at practical completion.

Read the quotation template priced trade by trade

Questions people ask

What is good, better, best pricing in a proposal?

Three versions of the same job at three prices, such as essential, standard and premium. It works when the versions are genuinely different packages. For most custom service work, a single base scope with one or two priced extras achieves the same effect with less complexity, because the client builds the better version themselves.

Should optional extras be ticked by default?

Only when most clients take them and leaving them out would surprise the client later, such as travel on a wedding booking. A pre ticked extra raises the total the client first sees, which can make the base feel expensive. Unticked extras keep the headline price honest and let the client add value. Either way, make the choice visible.

Does showing a higher option first help sell the cheaper one?

Anchoring research suggests an earlier, larger number can shape how later prices feel, but in a proposal the effect is modest and easy to overdo. Clients notice a decoy package that exists only to make another look cheap. Order items in the sequence the work happens, and let the extras sit after the core scope.

Can the client change quantities, not just add extras?

In tools that support it, yes. OneCraft items can be marked quantity editable with a minimum and maximum, so a client can choose between six and twelve downlights or two to four shoot days. The total updates as they choose, and the accepted quantity is the one that appears on the invoice.

How should GST appear when the total changes?

Show it on the total the client actually selects. If your prices exclude GST, the summary should add GST to the selected subtotal; if they include it, say the total includes GST. The ATO accepts a statement that the total includes GST when GST is exactly one eleventh of the price.

Do optional items reduce the chance of acceptance?

Too many can. Iyengar and Lepper's study found shoppers offered 24 jams were more likely to stop but less likely to buy than those offered 6. One or two well chosen extras rarely cause that problem. If clients keep asking what an extra is for, remove it or rewrite its description.

Written by

Nuwan Madhusanka · Co-founder

Works across the builders and the export paths: how a form becomes a PDF, how a flyer canvas becomes a print file, and how a signed document carries its audit trail.

LinkedIn profile

Sources

Written and checked by the OneCraft team. Last checked .

Make your own proposal

Describe what you need and the generator writes and designs it, then you edit anything you like.

See what it can make

Read next

For the steps inside the builder, read the guide on this topic.