Bathroom renovation flyer with three package tiers

A bathroom renovation flyer has to replace "it depends" with a price range, a time frame and one person to deal with, because those are the three things that stop people starting. These three designs for Wrenwater Bathrooms, a fictional Melbourne builder, offer three fixed price tiers at $12,000, $18,000 and $26,000, a full renovation in 10 working days, and a named site lead.

Create a flyer with OneCraftA4 print and 7 more native sizes

The 3 designs

The same business laid out three ways, on three templates and three colour themes. Every price, name and time on these was written for this example, so you can judge the layouts on real content rather than placeholder text.

WB
Wrenwater Bathrooms, Melbourne
FIXED PRICE
Three ways to renovate
Each tier is a fixed price contract, GST inclusive, finished in 10 working days.
Ready $12,000
Renew $18,000
Rebuild $26,000
Ready, $12,000
Retile floor and walls, new vanity, toilet and tapware, and a shower screen. The layout stays as it is.
Renew, $18,000
Everything in Ready, plus a frameless screen, a shower niche, a heated towel rail and a wall hung vanity.
Rebuild, $26,000
A new layout, a freestanding bath, floor to ceiling tiles and the plumbing moved where you want it.
YOUR COORDINATOR
Dana Whitlock, site lead
Registered builder DB-L 61842
03 5550 8143 wrenwater.example

Three package tiers

Three Ways to Renovate

Also native at A4 Landscape, Instagram Post, Instagram Story, Facebook Post, LinkedIn Post, Facebook Cover, Twitter Header

WRENWATER
wrenwater.example
freestanding bathtub bathroom
modern bathroom vanity
DONE IN 10 WORKING DAYS
ONE COORDINATOR, ONE DATE
A bathroom renovation usually stalls between trades. At Wrenwater one coordinator books the plumber, waterproofer, tiler and electrician in sequence, so the room is out of action for 10 working days, not six weeks. The finish date is in the contract before demolition starts.
walk in shower tiles bathroom
FIXED PRICE
Three tiers from $12,000 to $26,000, GST inclusive, with every inclusion listed in a major domestic building contract. Victorian registered builder DB-L 61842, with domestic building insurance on every job over $20,000. Call 03 5550 8143 for a measure and quote.

Portfolio photos

Full Renovation in 10 Working Days

Also native at A4 Landscape, Instagram Post, Instagram Story, Facebook Post, LinkedIn Post, Facebook Cover, Twitter Header

WRENWATER BATHROOMS
MELBOURNE, VIC
freestanding bathtub bathroom
Ten working days
FULL BATHROOM RENOVATION
One trade coordinator books every trade in order and stays your single contact. The price is fixed in a written contract before demolition, and the finish date is in it too. Tiers at $12,000, $18,000 and $26,000, GST inclusive.
01
DAYS 1 TO 3
Strip out, plumbing rough in and electrical, with the site sealed off from the house.
02
DAYS 4 TO 7
Waterproofing to AS 3740, cured and flood tested, then wall and floor tiling.
03
DAYS 8 TO 10
Fit off, screens and silicone, a clean, and a walk through with the coordinator.
03 5550 8143 WRENWATER

Ten day schedule

Ten Working Days

Also native at A4 Landscape, Instagram Post, Instagram Story, Facebook Post, LinkedIn Post, Facebook Cover, Twitter Header

The three designs

The tiers design is the price sheet. A circle at the top holds the logo and "Three ways to renovate", three chips show the tier prices, three cards spell out what each tier includes, and the footer names the site lead with the registration number and phone. Use it after a measure and quote visit or as a letterbox drop in suburbs full of 1970s and 1980s homes. The portfolio design is photo led: a bathroom with a freestanding bath, a vanity, a walk in shower, the headline "Done in 10 working days" and two short paragraphs on the coordinator and the fixed price. It suits Instagram and a display stand at a home show. The schedule design is the explainer: one wide photo, "Ten working days" as the headline, a paragraph about the fixed price contract, and the three stage plan. Hand it to a customer who is comparing quotes and worried about how long they will be without a bathroom.

What this flyer must carry

A renovation flyer needs the price range and what it buys, the time frame, the contract terms, who manages the job, the registration that makes the business accountable and a way to book a measure. Wrenwater prints all six. In Victoria, building work that involves more than one trade and is worth more than $10,000 needs a major domestic building contract, and only a registered builder can enter one, so every tier here sits under that rule. Domestic building insurance is required on work over $20,000 from 1 July 2026, up from $16,000, which means the Rebuild tier carries it and Ready and Renew do not. The registration number on this flyer is fictional, DB-L 61842, written in the format Victorian registrations use. Prices include GST.

How to adapt this flyer

For an ensuite and powder room specialist, use the tiers design with smaller rooms and lower prices, and change the coordinator line to the number of days a toilet is out of use, because that is the question in a one bathroom home. For an accessible bathroom builder, use the schedule design and swap the stages for assessment, grab rails and a hobless shower, with a line about NDIS or aged care funding where it applies. For a laundry and bathroom package, use the portfolio design and replace one photo with a laundry, keeping the 10 working day promise if it still holds.

What makes these work

Three tiers with names and contents

The tiers design shows Ready $12,000, Renew $18,000 and Rebuild $26,000 as chips, then explains each: Ready keeps the layout and replaces the surfaces and fittings, Renew adds a frameless screen, niche, towel rail and wall hung vanity, Rebuild moves the plumbing and adds a freestanding bath. A reader can place their own bathroom in one tier before calling.

The schedule is shown day by day

The schedule design splits "Ten working days" into days 1 to 3 for strip out and rough in, days 4 to 7 for waterproofing to AS 3740 and tiling, and days 8 to 10 for fit off and a walk through. A ten day promise is easy to doubt; a plan that names the waterproofing cure shows how it is done.

A person, not a company, runs the job

The tiers design closes on "Your coordinator, Dana Whitlock, site lead" with the builder registration and phone beside her name. The portfolio design explains why: one coordinator books the plumber, waterproofer, tiler and electrician in order. Renovations go wrong between trades, so a single named contact is the strongest promise on the page.

Questions people ask

Do I need a contract for a bathroom renovation in Victoria?

If the work involves more than one trade and costs more than $10,000, Victoria requires a major domestic building contract, and only a registered builder can enter into one. Most full bathroom renovations meet both tests. The contract should state the price, the inclusions and the expected completion, which is why the tiers on this flyer are described as fixed price contracts.

When does a bathroom renovation need builder's warranty insurance?

In Victoria, domestic building insurance is required when the work is worth more than $20,000, a threshold that rose from $16,000 on 1 July 2026. The builder takes it out after the contract is signed. On this flyer only the $26,000 Rebuild tier passes the threshold, so check the current figure with Consumer Affairs Victoria before printing yours.

Should a renovation flyer show prices or ask people to call?

Show tiers. A full custom quote is still needed, but a range tells a reader whether they are in the right place before they spend time on a site visit. Three named tiers with their inclusions work better than one "from" price, because they let the reader place their own bathroom without guessing what the cheapest price leaves out.

Which sizes do these bathroom renovation designs come in?

All three are authored natively for every canvas size: A4 portrait and landscape, Instagram post and story, Facebook post, LinkedIn post, Facebook cover and Twitter header. Resizing uses the layout made for each size and carries your text and photos across, so one set of copy serves the letterbox flyer and the social posts.

How many photos should a bathroom renovation flyer use?

One strong finished photo is enough for a letterbox flyer; three works for a portfolio piece. The portfolio design has three photo slots for a bath, a vanity and a shower. Use photos of your own completed jobs where you can, and make sure the room in the photo matches the tier you are advertising.

Can I export the flyer as a PDF for a printer?

Yes. Export as PDF, PNG or JPG. The A4 page exports at 2480 by 3508 pixels, which is A4 at 300 DPI, and the PDF includes every page if the flyer has more than one. The PDF is made of page images, so the text cannot be selected or searched. There is no bleed or CMYK setting.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make one like this

Other flyer examples

Want the steps in the builder? Read Add or replace images in a flyer, then Choose your flyer template, theme and size. For everything this generator can do, see the flyer maker.

Sources

Written and checked by the OneCraft team. Last checked .