Purchase order PO-8842

Purchase order

A civil contractor buys structural steel for a job that starts in three weeks. The order is written by the buyer, not the seller, and almost everything on it exists to stop a surprise arriving on the truck.

Create a document with OneCraft3 A4 pages, editable, then download as a PDF

The document, page by page

Every page as it renders and as it prints, with nothing summarised. Read the wording before you reuse it.

Glenrowan Civil Contractors
ABN 72 338 907 145 · 18 Quarry Road, Riverstone NSW 2765 · purchasing@glenrowancivil.example · 02 9627 3300
Glenrowan Civil Contractors
Glenrowan Civil Contractors
This order is an offer to buy. It is accepted when the supplier acknowledges it or despatches any part of it, whichever happens first. Terms printed on a supplier acknowledgement, docket or invoice do not form part of this contract.
The prices above are firm until 30 September 2026 and are not subject to rise and fall. Any surcharge, levy or fuel adjustment not shown on this order will not be paid.
Nothing outside this order is to be supplied without a written variation signed by the site manager. A verbal instruction from anyone on site, including a foreman, is not authority to supply or to charge.
Goods are inspected within five business days of delivery. Anything damaged, short, or not to the specification above is rejected in writing, and the supplier collects it at its own cost within ten business days.
Test certificates to AS/NZS 3679.1 are required for all hot rolled sections supplied on this order. Payment for a delivery is not due until its certificates have been received, regardless of the invoice date.
Invoice each delivery separately, quoting PO-8842 and the delivery docket number. Terms are 30 days from the end of the month of a correct invoice. Title passes on delivery and risk passes when the load is unloaded and accepted.

Sign the acknowledgement below and email it to purchasing@glenrowancivil.example within two business days. Signing confirms the parts, the prices and both delivery dates. If either date cannot be met, say so on the acknowledgement rather than after the load is booked, because the crane and the crew are hired against these dates.

:
:
:
:
:
:

Section by section

What each section is for, so you can keep the ones you need and drop the rest.

Contractor letterhead
Buyer name, ABN, purchasing email and phone on every page, since the supplier will copy the order into its own system.
Raised, required on site, terms, total
The order date, the date the steel has to be standing on the slab, the payment terms and the committed value.
Supplier, deliver to, invoice to
Three separate addresses, because the goods, the paperwork and the payment all go to different places.
Items ordered
Five lines with part numbers, full section descriptions, quantities and unit prices, in the wording the supplier catalogue uses.
Delivery and GST totals
Goods subtotal, the freight for two loads priced separately, then GST and the committed order total.
Delivery window
The two dated loads, the hours, the notice call and the truck number the site expects the afternoon before.
Access and unloading
Which gate, and the fact that the supplier unloads with its own crane because there is no forklift on site.
Paperwork on arrival
Delivery docket quoting the order, plus mill certificates, with a plain statement that a load without them is turned around.
Terms of purchase
Six numbered clauses on acceptance, firm pricing, written variations, inspection and rejection, documentation, and invoicing.
Unmatched invoice warning
Explains the three way match and what happens to an invoice that cannot be tied to an order line.
Acknowledgement blocks
One signature for the buyer authorising the spend, one for the supplier confirming the parts, prices and both dates.

What makes this document work

The buyer sets the terms

Clause one says that anything printed on the supplier acknowledgement, docket or invoice does not form part of the contract. That sentence is the reason to raise an order rather than simply accept a quote.

Payment is tied to the paperwork

Mill test certificates are named as a condition, and payment for a load is not due until they arrive whatever the invoice date says. Steel without certificates is steel nobody can sign off.

It tells the truck exactly what to do

Two dated loads, a four hour window, one gate, unloading by the supplier's own crane because the site has no forklift, and a mobile number to ring the afternoon before.

Questions people ask

What is a purchase order?

A written offer from a buyer to a seller, listing exactly what is being bought, at what price, delivered when and where. It becomes a contract when the supplier acknowledges it or ships against it.

What is the difference between a purchase order and an invoice?

The order comes first and is written by the buyer. The invoice comes after delivery and is written by the seller. Accounts payable matches one to the other before anything is scheduled for payment.

Why do invoices get returned for a missing order number?

Because a three way match of order, delivery docket and invoice is what stops duplicate and phantom billing. An invoice with no order number cannot enter that process, so it goes back rather than into a queue.

Can a purchase order include the buyer's own conditions?

Yes, and that is most of its value. This one fixes prices to a date, refuses unnamed surcharges, rules out verbal variations, sets an inspection window and states when title and risk pass.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make my purchase order

Other document examples

Want the steps in the builder? Read Create a document with AI, then lay it out exactly how you want it. For everything this generator can do, see the document maker.