Proposals
What to include in a quote, checked against 31 examples
A quote needs your business details and ABN, the client, a scope in plain words, the priced lines with tax, how long the price holds, the payment terms and a way to accept. All 31 quotes and proposals checked here carry those; where they differ is licence numbers, warranties and cancellation terms.
Nuwan Madhusanka · Co-founder
4 min read · Published
Include your business name and ABN, the client, a reference, a plain description of the work, each priced line with GST, the total, how long the price holds, the deposit and payment terms, the conditions that change the price, and somewhere to accept with a name and date. Every one of the 31 quotes and proposals checked on this site carries the core of that list.
What was checked
The set is the 14 quote and 17 proposal examples on this site, read on 21 October 2026. They are finished documents for fictional Australian businesses: trades, creative studios, consultants, event companies and a furniture supplier. A script searched each document’s text for the elements in the table above, and the cases where wording varied, such as “excluding GST” against “prices include GST”, were checked by hand.
The examples were written to be complete, so the interesting rows are the ones that are not 31 out of 31. They show which elements depend on the trade.
The seven things every example carries
- Business name and ABN. In the letterhead or footer of all 31. The ABN is what lets a business client pay without withholding, as the ABN on an invoice page explains.
- Scope before price. Every quote opens with a Scope section, and every proposal with the client’s needs and the deliverables, before the pricing table. A client reads what they are buying before the number.
- GST stated. All 14 quotes say whether prices include GST at the top of the pricing section, and the proposals state prices excluding GST. The Australian Taxation Office’s tax invoice rules apply to the invoice, not the quote, but a quote that leaves GST unclear becomes an argument at invoice time.
- Validity. Each quote prints a Valid until date under its reference, and each proposal states how many days its price holds. 30 days is most common, used by 19 of the 31.
- Optional extras. Every example lists at least one optional line below the required work.
- Numbered terms. A short terms section follows the price in all 31: payment, then the conditions specific to the job, then validity.
- Acceptance lines. Every example ends with name and date lines for the client and the business.
Where the trades differ
Deposit lines. 27 of the 31 show Deposit due now and Balance under the total. The four without are monthly services billed in arrears or in advance: the cleaning quote, the bookkeeping and accounting proposals and the managed IT proposal. The deposit data post shows the percentages by trade.
Reference numbers. Every quote carries one, in the form business initials, Q and a number, for example TWP-Q-3308 on the plumbing quote. Only 4 of 17 proposals do. A quote is matched to a purchase order and an invoice; a proposal usually is not.
Licence numbers. Four of the seven building trade quotes print a licence or registration number beside the ABN: the electrical quote, the painting quote with its Queensland building licence, the plumbing quote and the renovation quote. Licensing rules differ by state and trade, so the right answer for your business is the one your licensing body gives.
Cancellation. 14 of 17 proposals say what happens if the client stops part way: notice periods, which stage is billed, whether the deposit is kept. Only one quote does, the wedding photographer’s, because a date booked months ahead is the one quote here where the client could cancel long before the work.
Warranties. Six documents state a warranty: the electrical, painting, roofing and landscaping quotes, the software development proposal and the furniture supplier’s proposal. Two proposals state the opposite plainly. The grant writing proposal says funders decide and nothing is guaranteed, and the SEO proposal says rankings are not guaranteed. Saying what is not promised is as useful as a warranty.
A checklist for your own quote
- Business name, ABN, contact details and licence number if your trade has one.
- Client name, site address and the date.
- A reference number you will reuse on the invoice.
- Scope in words: what is included, how it was measured, and what is not included.
- Priced lines with quantities and units, GST per line, subtotal, GST and total.
- Optional extras, marked as optional.
- Deposit and balance, with when each falls due.
- Terms: payment, the conditions that change the price, warranty, cancellation.
- How long the price holds.
- How to accept, with a name and date.
How to break down a quote covers the pricing lines in detail, how to write a quote covers the wording, and quote, invoice or proforma covers which document to send when.
In the product
The proposals module writes a quote or proposal in a fixed section order with exactly one pricing table, terms as numbered clauses, and the pricing settings: currency, tax label, deposit and validity. The client opens a tracked link, can tick optional items and change editable quantities, and accepts with a name, email, drawn signature and consent box, or by e-signature when that accept mode is chosen. An expired quote cannot be accepted. The AI quote generator page shows the brief, and the guide to creating a quote with AI walks through it.
| Element | Quotes (14) | Proposals (17) | All 31 |
|---|---|---|---|
| Business name and ABN | 14 | 17 | 31 |
| Scope in words before the prices | 14 | 17 | 31 |
| Statement that prices include or exclude GST | 14 | 17 | 31 |
| How long the price holds (date or days) | 14 | 17 | 31 |
| At least one optional extra | 14 | 17 | 31 |
| A numbered terms section | 14 | 17 | 31 |
| Name and date lines for acceptance | 14 | 17 | 31 |
| Deposit due now and balance lines | 13 | 14 | 27 |
| A quote or reference number | 14 | 4 | 18 |
| Cancellation or postponement terms | 1 | 14 | 15 |
| A warranty or guarantee clause | 4 | 2 | 6 |
| A trade licence number in the letterhead | 4 | 0 | 4 |
A finished example
A plumbing quote should separate the product from the labour, say what is removed and what certificate is issued, and tell the customer how long they will be without water. This example from a Central Coast plumber replaces a failed electric storage unit with a 270 litre heat pump for $4,640 including GST, with two small extras the customer can add.
Read the plumbing quote example for a hot water system replacementQuestions people ask
Is a quote legally binding once the client accepts it?
Usually it becomes part of a contract once accepted, which is why the scope, price, validity and terms on it matter. The question page on whether an accepted quote is binding covers the detail. For home building work, state law often requires a written contract on top of the quote above a set price.
How long should a quote be valid for?
Long enough for the client to decide and short enough that your costs have not moved. In this set 19 of the 31 documents hold their price for 30 days, 4 for 21 days and 8 for 14 days. Trades whose materials prices move, such as plumbing and electrical, sit at 14 days.
Should a quote include terms and conditions?
The terms that change what the client pays or gets should be on the quote itself: payment stages, what happens if hidden damage is found, weather delays, warranty and cancellation. Every example here has a numbered terms section after the pricing, with four to eight clauses, six most often, rather than pages of boilerplate.
Do I need my licence number on a quote?
For licensed trades in many states, yes, and it is good practice everywhere. In this set, the electrical, painting, plumbing and renovation quotes print the licence or registration number in the letterhead beside the ABN. Check your state's licensing rules, because some require the number on advertising and contracts as well.
What is the difference between a quote and a proposal?
A quote prices a defined job, so it is short: the quotes here run three pages with a median of about 500 words. A proposal sells an approach and adds about us, the client's needs and the method before the price, running five or six pages. The page comparing a quote, an estimate and a proposal sets out when each fits.
Should I include photos or drawings in a quote?
Only when they settle what the work is. A sketch of the garden layout or a photo of the cracked tiles prevents a dispute later; a gallery of past jobs belongs on your website. The examples here describe the measured scope in words, which is what a client reads when the job is finished and the invoice arrives.
Written by
Nuwan Madhusanka · Co-founder
Works across the builders and the export paths: how a form becomes a PDF, how a flyer canvas becomes a print file, and how a signed document carries its audit trail.
LinkedIn profileWritten and checked by the OneCraft team. Last checked .
Make your own proposal
Describe what you need and the generator writes and designs it, then you edit anything you like.
See what it can makeRead next
How to write a quote request form tradies can price from
A quote request form works when the person pricing the job can put a number on it from the answers alone: what the job is, how big it is, what the site is like, when it is wanted and roughly what the customer expects to spend. Ask for a measurement and a specific photo instead of a free text description, and most jobs can be quoted without a call to arrange a call.
How to write an invoice
An Australian tax invoice must show that it is a tax invoice, the seller's identity and ABN, the issue date, what was sold with quantity and price, the GST, and how much of each sale is taxable, plus the buyer's identity or ABN from $1,000. Add an invoice number, a due date and payment details so it gets paid, not just filed.
Contract statistics: clauses in 94 agreements
A finished small business agreement in this set has 7 numbered clauses, about 16 sub-clauses and runs 4 pages. Company and partnership agreements run longest at a median of 10 clauses, trade jobs shortest at 6, and fewer than half of the 94 agreements name the state law that governs them.
For the steps inside the builder, read the guide on this topic.