Renovation quote

Renovation quote example for a laundry

A renovation quote should price each trade, state any allowances for things the owner still has to choose, and say what contract follows. This example from a Leichhardt builder prices a full laundry renovation at $14,780 including GST, with tiles to an allowance, a 10% deposit, and a note that a written contract follows before work starts.

Create a proposal with OneCraft3 A4 pages, 8 line items, accepted online

The quote, page by page

Every page as the client sees it and as it prints, pricing table included.

Bluegum Renovations
ABN 29 641 702 588 · Licence 277314C · 8 Marion Street, Leichhardt NSW 2040 · (02) 5550 3115
Bluegum Renovations · Quote for a laundry renovation at 19 Edith StreetPage 1 of 3

Quote for a laundry renovation at 19 Edith Street

Reference
BGR-Q-0659
Date
13 October 2026
Valid until
12 November 2026
Prepared for
Mark and Lena Ostrowski

Scope

A full renovation of the laundry at 19 Edith Street, about 5 square metres: strip out, waterproofing, new plumbing and electrical, tiling, and built in cabinetry with a stone benchtop. The work takes about three weeks, and the laundry is out of use for that time.
All trades, licensed where the work requires it
A waterproofing certificate for the wet area
Tiles to an allowance of 60 dollars a square metre
Cabinetry built to measure with a stone benchtop
Your contract
In New South Wales residential building work over 5,000 dollars needs a written contract. Once you accept, we send a small jobs contract for signing with the details it must contain, and no work starts until it is signed.
Bluegum Renovations · Quote for a laundry renovation at 19 Edith StreetPage 2 of 3

Investment

Prices include GST. The hamper and heated towel rail are optional: tick them on the online quote and the total updates.
ItemQtyUnit priceTaxAmount
Strip out and disposal
Remove the old tub, cabinet, tiles and lining, and dispose of all waste.
1A$1,650.0010%A$1,650.00
Waterproofing
Floor and wall waterproofing to the wet area, with a certificate from the licensed waterproofer.
1A$1,250.0010%A$1,250.00
Plumbing
Relocate the washing machine taps, fit a new tub and mixer, and a floor waste.
1A$2,400.0010%A$2,400.00
Electrical
Two new power points and an exhaust fan ducted outside.
1A$980.0010%A$980.00
Tiling
Floor tiles and a wall tiled to 1.2 metres, tiles supplied to a 60 dollar a square metre allowance.
1A$3,600.0010%A$3,600.00
Cabinetry
Floor cabinets with a stone benchtop and an overhead cupboard, built to measure.
1A$4,900.0010%A$4,900.00
Pull out hamperOptional
Suggested: a double pull out hamper in the floor cabinets.
1A$420.0010%A$420.00
Heated towel railOptional
Suggested: a hard wired heated towel rail on a timer.
1A$690.0010%A$690.00
SubtotalA$14,780.00
Includes GSTA$1,343.63
TotalA$14,780.00
Deposit due nowA$1,478.00
BalanceA$13,302.00
Bluegum Renovations · Quote for a laundry renovation at 19 Edith StreetPage 3 of 3

Terms

1.
Deposit and payments
The 10 percent deposit is invoiced on acceptance. The balance is invoiced in two parts: after tiling, and on completion, each on 7 day terms.
2.
Tile allowance
If you choose tiles above 60 dollars a square metre, the difference is added to the final invoice.
3.
Hidden problems
If the strip out reveals rot or damaged pipes, we show you and quote the repair before doing it.
4.
Validity
This quote is valid for 30 days.

Next steps and acceptance

Click Accept on the online quote, tick any options and sign. The deposit invoice arrives with a card pay link and we send your contract.
Accepted by Mark and Lena Ostrowski
Name:
Date:
For Bluegum Renovations
Name:
Date:

The pricing, line by line

Strip out and disposal
1 × $1,650.00
Waterproofing
1 × $1,250.00
Plumbing
1 × $2,400.00
Electrical
1 × $980.00
Tiling
1 × $3,600.00
Cabinetry
1 × $4,900.00
Pull out hamper (optional)
1 × $420.00
Heated towel rail (optional)
1 × $690.00
Tax
$1,343.63
Total
$14,780.00
Deposit due on acceptance
$1,478.00

Section by section

Title and quote details
Reference, date, a 30 day validity and the owners, under a letterhead with the builder's licence number.
Scope
The 5 square metre laundry, every trade and three weeks out of use, four inclusions, and a note on the contract that follows.
Investment
Six trade lines including GST, with a pull out hamper and a heated towel rail as options.
Terms
A 10% deposit and two progress payments, the tile allowance, hidden problems and validity.
Next steps and acceptance
Accept online with a signature, then the deposit invoice and the contract.

Why a renovation quote is not the contract

A quote tells the owner what the job costs and lets them say yes. For residential building work, the law usually wants more than that. In New South Wales, work over $5,000 needs a written contract, work under $20,000 can use a small jobs contract, and larger jobs need a fuller contract with a prescribed checklist and, in most cases, home building compensation cover before a deposit is taken. This quote is for a job under $20,000, takes a 10% deposit, the most allowed for residential work in the state, and says in a note that the contract follows before any work starts. Other states have their own thresholds, so check yours before copying the note.

How the price adds up

The six trades add to $14,780 including GST: strip out $1,650, waterproofing $1,250, plumbing $2,400, electrical $980, tiling $3,600 and cabinetry $4,900. The hamper adds $420 and the heated towel rail $690; with both the total is $15,890, still under the $20,000 line. The 10% deposit, $1,478, is invoiced when the owners accept, with a card pay link. The balance is paid in two parts after tiling and on completion, which clause 1 states, so payments follow work the owners can see.

How to adapt this quote

Price by trade and put your licence number in the letterhead. Use allowances for anything the owner has not chosen yet, such as tiles, tapware or benchtops, and say what happens if they choose above it. Name the certificates the owner will receive, such as waterproofing. Keep a hidden problems clause, since every strip out finds something. Check your state's rules on written contracts, deposits and insurance before you quote, and say in the quote what paperwork follows, so the owner is not surprised by a second document.

What makes this quote work

Each trade is a line

Strip out, waterproofing, plumbing, electrical, tiling and cabinetry are six lines from $980 to $4,900. The owners can see that cabinetry and tiling are most of the cost, and compare another builder's quote trade by trade.

Undecided choices have an allowance

Tiles are priced to a $60 a square metre allowance, and clause 2 adds the difference if the owners choose dearer tiles. Allowances are how a quote stays fixed while the client is still choosing finishes.

It says what paperwork follows

The note says residential building work over $5,000 in New South Wales needs a written contract, that a small jobs contract follows, and that no work starts until it is signed. The deposit stays at 10%, within the state's limit for residential work.

Questions people ask

What should a renovation quote include?

The scope and area, each trade with its price, allowances for items still to be chosen, certificates the owner will receive, how long the room is out of use, optional extras, GST, the deposit and progress payments, what happens with hidden problems, validity and what contract follows. This example covers each on three A4 pages.

How much does a laundry renovation cost?

It depends on size, finishes and how much plumbing moves. This example quotes $14,780 including GST for a 5 square metre laundry with waterproofing, relocated taps, two new power points, tiling to a $60 allowance and built in cabinetry with a stone benchtop.

How much deposit can a builder take in NSW?

For residential building work in New South Wales the deposit is capped at 10% of the contract price, and on jobs that need home building compensation cover the builder cannot take a deposit until the cover is in place. This quote asks for 10% on a job under $20,000.

Do I need a contract for a small renovation?

In New South Wales residential building work over $5,000 needs a written contract, and work under $20,000 can use a small jobs contract. This quote says a small jobs contract follows acceptance and no work starts until it is signed. Other states set their own thresholds.

What is a tile allowance in a renovation quote?

An amount per square metre included for tiles the owner has not chosen yet. This quote allows $60 a square metre, and clause 2 adds the difference to the final invoice if the owners choose more expensive tiles. It keeps the quote fixed while the finishes are still being picked.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make one like this

Other proposal, quote and invoice examples

Want the steps in the builder? Read Send a proposal and get paid. For everything this generator can do, see the proposal maker.

Sources

Written and checked by the OneCraft team. Last checked .