Electrical quote

Electrical quote example for a switchboard upgrade

An electrical quote should name the work, price parts and labour by line, and say what certificate the customer receives. This example from a Geelong electrician replaces a ceramic fuse board with a new switchboard and eight safety switches for $2,820 including GST, with LED downlights and interconnected smoke alarms as options.

Create a proposal with OneCraft3 A4 pages, 5 line items, accepted online

The quote, page by page

Every page as the client sees it and as it prints, pricing table included.

Bellarine Sparks Electrical
ABN 34 581 220 917 · REC 28411 · 22 Fyans Street, South Geelong VIC 3220 · (03) 5550 7410
Bellarine Sparks Electrical · Quote for a switchboard upgrade at 9 Pakington StreetPage 1 of 3

Quote for a switchboard upgrade at 9 Pakington Street

Reference
BSE-Q-1187
Date
13 October 2026
Valid until
27 October 2026
Prepared for
Aaron and Michelle Lowe

Scope

Replace the original ceramic fuse switchboard at 9 Pakington Street with a new switchboard, with a safety switch on each of the eight circuits found at our inspection on 9 October. The power will be off for about five hours on the day.
New enclosure, main switch and eight combined safety switches
Every circuit tested and labelled
Certificate of Electrical Safety issued on completion
Old board removed and disposed of
Before we start
If the testing finds a fault in your wiring that must be fixed before the new board can be energised, we will show you, quote the repair and wait for your approval before doing it.
Bellarine Sparks Electrical · Quote for a switchboard upgrade at 9 Pakington StreetPage 2 of 3

Investment

Prices include GST. LED downlights and smoke alarms are optional: tick them on the online quote and choose how many downlights.
ItemQtyUnit priceTaxAmount
New switchboard
Remove the ceramic fuse board, fit a new enclosure and main switch, and label every circuit.
1A$1,680.0010%A$1,680.00
Safety switch per circuit
A combined safety switch and circuit breaker on each circuit, so a fault trips one circuit only.
8A$115.0010%A$920.00
Testing and certificate
Insulation and earth testing of every circuit, and your Certificate of Electrical Safety.
1A$220.0010%A$220.00
LED downlightsOptional
Replace old halogen downlights with dimmable LED fittings rated for insulation contact.
6A$98.0010%A$588.00
Interconnected smoke alarmsOptional
Mains powered alarms with battery backup, linked so all sound together.
3A$185.0010%A$555.00
SubtotalA$2,820.00
Includes GSTA$256.37
TotalA$2,820.00
Deposit due nowA$846.00
BalanceA$1,974.00
Bellarine Sparks Electrical · Quote for a switchboard upgrade at 9 Pakington StreetPage 3 of 3

Terms

1.
Payment
The 30 percent deposit is invoiced on acceptance and covers materials. The balance is invoiced on completion, on 7 day terms.
2.
Extra work
Anything outside this scope is quoted and approved by you before it is done.
3.
Warranty
Workmanship is guaranteed for 12 months; products carry the manufacturer warranty.
4.
Validity
This quote is valid for 14 days.

Next steps and acceptance

Click Accept on the online quote, tick any options, and sign. The deposit invoice arrives with a card pay link and we book your power off day.
Accepted by Aaron and Michelle Lowe
Name:
Date:
For Bellarine Sparks Electrical
Name:
Date:

The pricing, line by line

New switchboard
1 × $1,680.00
Safety switch per circuit
8 × $115.00
Testing and certificate
1 × $220.00
LED downlights (optional)
6 × $98.00
Interconnected smoke alarms (optional)
3 × $185.00
Tax
$256.37
Total
$2,820.00
Deposit due on acceptance
$846.00

Section by section

Title and quote details
Reference, date, a 14 day expiry and the homeowners it is prepared for, under a ledger letterhead with the electrical licence number.
Scope
The board, the eight circuits found at inspection and five hours without power, then four inclusions and a note on faults found during testing.
Investment
The switchboard, eight safety switches, testing and certificate, with downlights (1 to 12) and smoke alarms as options, prices including GST.
Terms
A 30% materials deposit, extra work, a 12 month workmanship warranty and validity.
Next steps and acceptance
Accept online with a signature, then the power off day is booked.

What a homeowner looks for in an electrical quote

Most people asking for an electrical quote cannot judge the work itself, so they judge the quote. They want to know what will be done in plain words, what each part costs, whether the electrician is licensed, and what proof they get at the end. This quote answers each one. The scope names the board and the eight circuits counted at the inspection, the letterhead carries the electrician's licence number, the lines separate the board from the safety switches and the testing, and the certificate is promised in both the scope and the price. It also says how long the power will be off, which is the first practical question every household asks.

How the price is built

The new switchboard is $1,680, eight safety switches are $920 at $115 each, and testing with the certificate is $220, a total of $2,820 including $256.37 of GST. The quote is set to tax inclusive because the customers are a household, so every line already includes GST and the summary shows it as Includes GST. LED downlights at $98 each are optional and the customers choose between one and twelve; six adds $588. Interconnected smoke alarms add $555 for three. The 30% deposit, $846 on the default total, covers the materials the electrician buys before the job, and the balance is invoiced when the work is finished.

How to adapt this quote

Count the circuits at the inspection and price per circuit, because that is what changes between houses. Put your licence number in the letterhead and name the certificate your state requires on completion. Keep a note about faults found during testing, since old wiring often turns something up, and promise to quote before fixing. Offer the obvious extras as options rather than upselling on the day: downlights and smoke alarms are the two homeowners most often add when the power is already off. If your customer is a business, switch the quote to prices before GST.

What makes this quote work

Safety switches are priced per circuit

The quote prices eight safety switches at $115 each, one per circuit found at the inspection, so the homeowner can see why the job costs what it does. It also explains in the line why a switch per circuit is better: a fault trips one circuit only.

The certificate is in the price

Testing and the Certificate of Electrical Safety are a $220 line of their own, and the scope promises the certificate on completion. In Victoria that certificate is what proves the work was done by a licensed electrician to standard.

Surprises have a rule

The warning note says that if testing finds a wiring fault, the electrician will show it, quote it and wait for approval. Old switchboard jobs often find one, and saying so before the job starts is what keeps the quote trusted.

Questions people ask

What should an electrical quote include?

The address and the work, the number of circuits or points, each part and its price, testing and the compliance certificate, how long the power will be off, what happens if a fault is found, optional extras, GST, payment terms, warranty and how long the quote is valid. This example covers each on three A4 pages.

How much does a switchboard upgrade cost?

It depends on the number of circuits and the condition of the wiring. This example quotes $2,820 including GST for a new switchboard with a safety switch on each of eight circuits, testing and the certificate. A house with more circuits, or wiring that needs repair, will cost more.

Do I get a certificate after electrical work?

In Victoria a licensed electrician must give you a Certificate of Electrical Safety for most electrical work, and other states have their own compliance certificates. This quote includes the testing and certificate as its own $220 line and promises it on completion. Keep it with your home records.

Should an electrical quote include GST?

For a household, quote prices including GST, because that is what they pay. This quote is set to tax inclusive, so each line already includes GST and the summary shows the GST share. For a business customer, prices before GST with GST added on the subtotal are usual.

Why does the electrician want a deposit?

To pay for materials bought before the job, such as the switchboard and safety switches. This quote asks for 30% on acceptance, issued as an invoice with a card pay link, and invoices the balance on completion. Without a deposit the electrician carries the cost of parts for a job that might not go ahead.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make one like this

Other proposal, quote and invoice examples

Want the steps in the builder? Read Send a proposal and get paid. For everything this generator can do, see the proposal maker.

Sources

Written and checked by the OneCraft team. Last checked .