E-signatures
E-signature for tradies: quotes signed on site
Tradies can use e-signatures to get quotes accepted, contracts signed and variations agreed before the work starts, either by emailing a signing link or by handing the customer a phone on site. In Queensland, domestic building work over $3,300 needs a written, dated contract signed by both parties, and a variation has to be given in writing before the extra work begins, so the signed record matters as much as the job.
Nuwan Madhusanka · Co-founder
6 min read · Published
Paperwork on a trade job arrives at the worst moments: in a ute between sites, at a kitchen bench while the customer is deciding, or halfway through a job when the customer asks for one more power point. E-signature helps most at exactly those moments, because the signature can be collected on the spot and the record goes to both sides without anyone finding a printer. This guide works through a job from quote to handover. It is general information, not legal advice, and building contract rules differ by state.
Quotes
A quote is where the job is won, and acceptance is where it becomes enforceable. The Queensland Building and Construction Commission puts it plainly: a quote is a formal statement of what a contractor will charge, and once it is accepted, in writing or even verbally, it becomes a legally binding contract.
Verbal acceptance is hard to prove. A signed quote is not. The embedded quote acceptance signing example shows the simplest version: a two page bathroom quotation for 14 Selwyn Street accepted by the homeowner with one signature. The builder placed four fields on the acceptance section, a signature, a name, a date and an optional field labelled Your order reference, and used no identity check because a quote is a document the sender wants read. From the status page the customer’s badge moved from Waiting to Viewed to Signed, and the completed quotation was emailed to both sides with a seven event record behind it.
Write the quote so acceptance is clear. State the scope, the price including GST, what is excluded, and how long the price holds. Place the signature field under a line such as “I accept this quote”, so the signature cannot be read as anything else.
Match the quote’s validity to the signing request. A request expires 30 days after it is created and that period cannot be changed, so a quote valid for 30 days lines up with its own link, while a quote valid for 60 days will outlive it and need a fresh request if the customer comes back late. If material prices move quickly in your trade, a shorter validity printed on the quote itself protects you better than any follow up.
Contracts and the Queensland thresholds
A signed quote is not always enough. The QBCC says a contract is not required for domestic building work valued under $3,300, although a simple agreement is still recommended. For work from $3,300 up to $20,000, a Level 1 contract is required, including the contractor’s details and licence number, a description of the work, the price and the completion date. At $20,000 and over, a Level 2 contract adds more, including the QBCC Consumer Building Guide and the statutory warranties.
Either way, the QBCC says the contract must be written, dated and signed by both parties before work begins, and the contractor must give the owner a fully signed copy within five business days. A completed signing request emails the certified PDF to every signer automatically, which puts a fully signed copy in the owner’s inbox the moment the last signature lands.
Other states set their own thresholds and contents. NSW Fair Trading, for example, publishes separate contract rules for home building work. Check yours before relying on a template, and check that your state’s rules do not require a particular form of signature for your contract.
For work you subcontract, the contractor agreement signing example is close to real life. A builder sends a carpentry package agreement to one subcontractor, who initials the stage payment table, types his carpentry licence number into a required field and signs a block for his company, all behind a six digit emailed code.
Variations
Variations cause more disputes than any other trade document, because they are agreed in a hurry on site. The QBCC says that before any variation work begins, the contractor must give the variation in writing, in person, by post or by email, within five business days of the agreement or before the work starts, whichever comes first. It should describe the change, its effect on timing and its cost.
A sent signing request cannot be edited, which suits variations well. Each variation becomes its own request with its own certified PDF, numbered in its title, so the job ends with a clean sequence: contract, variation 1, variation 2. Nobody can later alter a variation that was agreed.
Signing on site, on your phone
The customer is standing in front of you. Waiting for them to find an email is slower than handing over your phone.
In person signing does exactly that. Once a request has been sent, you open its status page and start a hosted session for the customer whose turn it is. The signing page opens on your device without the link appearing in the address bar, the identity check set for that signer is waived for the hosted session, and the record notes that the session was started by you before the signature. The session lasts thirty minutes. The liability waiver signing example shows the same flow at a front desk, and the certified copy still goes to the customer’s email.
On a phone narrower than 560 pixels the signing page switches to a compact layout, so the customer types any fields into a panel above the read only document and draws their signature with a finger. One signature fills every spot assigned to them.
Ordering and storing
Materials orders benefit from the same record. The order form signing example turns a supplier’s quotation into an order by giving the buyer a typed box under each product line for the quantity, then a signature, with the supplier’s account manager countersigning.
At the end of the job, keep each certified PDF with its certificate of completion, which lists the identity check, signing time, IP address and consent for each signer. If a final invoice is disputed, those are the documents that answer it. The table below follows a job from the site visit to that point.
Common mistakes
Starting work on a verbal yes. In Queensland, domestic work over $3,300 needs a signed written contract first.
One variation for a week of changes. Put each change in writing before it is done.
Photos sent separately from the contract. Merge them into the PDF you send, since a request carries one file.
Letting a quote request go stale. Every request expires 30 days after it was created, so follow up well before then.
Vague deposit terms. Say how much, when, and what it is for, as the deposit clause page explains, and write each change of scope as a contract variation. The same one signer workflow for independent work is covered in e-signature for freelancers.
Build it
The in person signing page covers the hosted session: it is available only once a request is sent or partly signed, only for the signer whose turn it is, it skips that signer’s identity check, and it lasts thirty minutes. Requests carry one PDF of up to 25 MB, up to 25 signers, and a Sign in order switch for customer first, contractor second. A sent request cannot be edited, expires after 30 days, and on completion emails the certified PDF to every signer. The tutorial on sending a PDF for e-signature walks through uploading the quote, placing fields and sending.
| Moment | Document | Who signs | How |
|---|---|---|---|
| After the site visit | Quote with scope, price and validity | Customer | Signing link by email, no identity check needed |
| Before work starts, over $3,300 in Queensland | Written domestic building contract | Customer and contractor | Signing link, customer first, contractor countersigns |
| Subcontracting a package | Subcontract agreement with the licence number | Subcontractor | Signing link with an emailed code |
| Ordering materials | Supplier order form with quantities | Buyer, then supplier | Quantities typed by the buyer in the order |
| Scope changes on site | Written variation with the change, time and cost | Customer and contractor | A new request for each variation, or on the spot on your phone |
| Safety or access conditions | Site induction or waiver | Visitor or worker | In person on your phone or tablet |
| Practical completion | Handover sign off with any defects noted | Customer and contractor | In person at the walk through |
| Final invoice dispute | Nothing new; produce the signed quote, contract and variations | Nobody | Download the certified PDFs and certificates |
A finished example
When a customer signs a quote online, acceptance stops being a phone call and becomes a certified file. This page shows the 14 Selwyn Street bathroom quotation from the documents examples accepted by the homeowner with a single signature, an optional order reference she typed herself, and the status page the builder watched change as it happened.
Read the sign a quote onlineQuestions people ask
Is a quote accepted by e-signature binding?
It can be. The Queensland Building and Construction Commission says that once you accept a quote, in writing or even verbally, it becomes a legally binding contract. A signed acceptance simply makes the agreement easy to prove. For domestic building work over the Queensland threshold, though, a quote acceptance is not a substitute for the written contract the rules require.
When do Queensland tradies need a written contract?
The QBCC says a contract is not required for domestic building work valued under $3,300, though a simple agreement is still recommended. Work above that needs a written contract, dated and signed by both parties before work begins, and the contractor must give the owner a fully signed copy within five business days. At $20,000 and above the contract must meet additional requirements.
Do variations have to be signed?
In Queensland, the QBCC says that before any variation work begins the contractor must give the variation in writing, delivered in person, by post or by email, within five business days of the agreement or before work starts, whichever comes first. It should set out the change, the time impact and the cost. A signed variation is the simplest proof both sides agreed to it.
Can the customer sign on my phone at the job?
Yes, if the request has already been sent. From the request's status page you can start an in person signing session for the customer whose turn it is and hand over your phone or tablet. The identity check you set for that signer is skipped for the hosted session, and the record notes that you hosted it. The session lasts thirty minutes.
Can I attach photos of the job to the contract?
Only inside the PDF. A signing request carries one PDF of up to 25 MB, so photos of the site, a sketch of the layout or a product sheet need to be merged into that file before you upload it. Keep images compressed so the file stays well under the limit and opens quickly on the customer's phone over mobile data.
What if the customer wants to change the quote before signing?
They can decline with a reason, which reaches you by email, and the request stops. A sent request cannot be edited, so update the quote and send a new one. The declined request stays on your list with its history, which is useful later if there is ever a question about which version of the price the customer actually agreed to.
Written by
Nuwan Madhusanka · Co-founder
Works across the builders and the export paths: how a form becomes a PDF, how a flyer canvas becomes a print file, and how a signed document carries its audit trail.
LinkedIn profileWritten and checked by the OneCraft team. Last checked .
Make your own signing flow
Describe what you need and the generator writes and designs it, then you edit anything you like.
See what it can makeRead next
E-signature for gyms and studios: waivers and memberships
Gyms and fitness studios can have waivers, membership agreements and house rules signed electronically, either on a tablet at the front desk or through a link sent before the first visit. What e-signature cannot do is change what the paperwork is allowed to say: Australian consumer law limits what a waiver can exclude, and some states set cooling off and cancellation rules that the membership agreement has to reflect.
How to write a quote request form tradies can price from
A quote request form works when the person pricing the job can put a number on it from the answers alone: what the job is, how big it is, what the site is like, when it is wanted and roughly what the customer expects to spend. Ask for a measurement and a specific photo instead of a free text description, and most jobs can be quoted without a call to arrange a call.
Quote vs invoice vs proforma invoice
A quote offers, a proforma previews, and an invoice demands payment, but only the last of the three is a tax document. They look alike on the page, so the fields and the numbering are what actually tell them apart.
For the steps inside the builder, read the guideon this topic.