Rate card, 1 July 2026 to 30 June 2027

Rate card

A studio publishes what each role costs by hour, by day and by booked week, then explains the arithmetic between them. A day is seven billable hours inside a seven and a half hour day, and a booked week is ten per cent off five of those.

Create a document with OneCraft4 A4 pages, editable, then download as a PDF

The document, page by page

Every page as it renders and as it prints, with nothing summarised. Read the wording before you reuse it.

Northmark Studio
Northmark Studio Pty Ltd · ABN 19 663 204 118 · Level 2, 41 Gheringhap Street, Geelong VIC 3220 · hello@northmarkstudio.example
Northmark Studio
Northmark Studio
Northmark Studio
Rate card 2026/27 · valid to 30 June 2027 · all rates exclude GSTPage 1 of 4
Rate card 2026/27 · valid to 30 June 2027 · all rates exclude GSTPage 2 of 4
Rate card 2026/27 · valid to 30 June 2027 · all rates exclude GSTPage 3 of 4
Rate card 2026/27 · valid to 30 June 2027 · all rates exclude GSTPage 4 of 4

Every rate below excludes GST. A day is seven hours of billable work inside a seven and a half hour day, so a booked day already carries thirty minutes of handover, standup and note writing at no charge. A booked week is five consecutive days held for one client and is discounted ten per cent.

Loadings are not stacked. Where two apply, the higher one is charged and the other is dropped. Work on a public holiday inside a same day brief bills at the public holiday rate, not at both. A loading is only ever charged when the client has asked for the timing in writing.

1
2
3
4
5
1
2
3

Northmark publishes this card rather than quoting on request, so a client comparing studios compares on one basis. If a number does not suit a project that otherwise fits, say so early.

Section by section

What each section is for, so you can keep the ones you need and drop the rest.

Letterhead and footer
The studio, its ABN and the standing note that every figure excludes GST, on every page.
The four things that define the card
Billing day length, the booked week discount, the smallest billing unit and how long the rates hold.
Rates by role
Eight roles from principal consultant to production, each with an hourly, day and weekly rate.
Reading a line
One role worked through from hourly to week, showing what the discount is worth in dollars.
Loadings
Four timing loadings with the percentage and the resulting rate for one named role.
No stacking
The rule that only the higher loading applies, and that a loading needs a written request.
Retainers
Three bands by monthly hours and minimum term, with the discount each earns on the role rate.
What a retainer buys
Reserved hours, a named lead and priority against what it does not buy, including rollover.
How time is counted
Five numbered rules on increments, meetings, travel, estimates, rework and timesheet visibility.
Expenses
Five expense types with how each is charged and the approval threshold that applies.
Terms
Validity, the capped annual review, invoicing, cancellation of a booked week and the GST position.
How a quote is put together
Three notes on the brief, the contingency and what a fixed price actually fixes.

What makes this document work

The three prices reconcile

Hourly times seven is the day rate, five days less ten per cent is the week. A senior designer at $215 an hour is $1,505 a day and $6,772.50 a week, and a client can check each step without asking what the discount was.

Loadings are capped rather than stacked

After hours, weekend, public holiday and same day work each carry a percentage, and where two apply only the higher one is charged. The example column shows the actual dollar rate an engineer becomes in each case.

The time rules are the part clients argue about

Fifteen minute increments, a thirty minute minimum per task, travel over thirty minutes at half rate, and rework caused by the studio not billed at all. Writing them down is what makes the timesheet uncontroversial.

Questions people ask

What is a rate card?

A published list of what a supplier charges for each role or service, with the units it is sold in and the rules that change the number. It is what lets a buyer compare suppliers without asking each one for a bespoke quote.

Should a rate card show day rates as well as hourly?

If the work is bought in days, yes. The useful part is the relationship between them. Here a day is seven billable hours inside a seven and a half hour day, so the half hour of handover and note writing is free and the client can see that it is.

How long should rates be held?

This card holds to 30 June 2027 for any work performed in that window, whenever the engagement started, and the annual review is capped at the change in the consumer price index plus one percentage point. A cap is what makes a multi year engagement possible.

Do loadings stack?

Not on this card. Where two apply the higher one is charged and the other is dropped, and a loading is only charged when the client asked for the timing in writing. Both rules exist to stop an invoice arriving with a surprise on it.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make my rate card

Other document examples

Want the steps in the builder? Read Create a document with AI, then lay it out exactly how you want it. For everything this generator can do, see the document maker.