Bramwell Rail Services Capability Statement

Capability deck

Eleven slides from Bramwell Rail Services, an invented track renewal contractor, sent to get onto an approved supplier list rather than to win a named job. A capability statement is normally a one page leave behind, and this is its expanded form: sections that map to what a category manager screens on, in the same order. There is no offer in it, no price, and one slide that admits the firm sits below the framework minimum on digital maturity.

Create a presentation with OneCraft11 slides, read in order

Every slide, in order

The whole deck as it renders, one slide after another. Read it the way the audience would.

A dramatic low angle photograph looking along a railway track at dusk, wet steel rails catching the last light, ballast and sleepers in sharp focus, overhead line equipment silhouetted against a bruised sky, desaturated industrial palette, no people, no text
A dramatic low angle photograph looking along a railway track at dusk, wet steel rails catching the last light, ballast and sleepers in sharp focus, overhead line equipment silhouetted against a bruised sky, desaturated industrial palette, no people, no text

Capability

Statement

Bramwell Rail Services, track renewal since 1997

Slide 1 · cover · States what the document is and the two facts a category manager screens on first.
A wide landscape photograph of a rail maintenance depot yard at first light, yellow on-track plant parked in a row, stacked rail panels and ballast bags, long low horizon with hills behind, overcast, documentary industrial style, no people, no text, no logos
A wide landscape photograph of a rail maintenance depot yard at first light, yellow on-track plant parked in a row, stacked rail panels and ballast bags, long low horizon with hills behind, overcast, documentary industrial style, no people, no text, no logos

Who We Are

A track renewal and maintenance contractor based in Doncaster, working the East Coast and Trans Pennine routes since 1997. Four hundred and eighty people, six depots, and no part of the work subcontracted except vegetation clearance.

WHAT WE HOLD OURSELVES TO

Hand back early

A possession handed back late is a failure even when the work is done. We plan to the handback, not to the task list.

Own the risk

Our own staff, our own plant, our own protection. The only thing we subcontract is vegetation.

Evidence it

Every possession closes with a signed record of what was done, measured, and left behind on site.

02

Slide 2 · intro · One paragraph on who the firm is, with the three commitments the rest of the deck has to evidence.

Seven Disciplines, One Workforce

Every one of these is delivered by directly employed Bramwell staff and Bramwell plant.

01
Plain line

Rail and sleeper renewal on plain line, up to 400 metres of track in a single overnight possession.

02
S&C renewal

Switch and crossing replacement, including modular panel delivery, welding and tamping to design.

03
Ballast

Undercutting, ballast cleaning and shoulder replacement, using the three cutting trains we own.

04
Survey

Track geometry survey and renewal design, done by our own nine designers rather than a consultancy.

05
Maintenance

Routine inspection, fastening replacement and reactive attendance, under a five year term contract.

06
Drainage

Cess and catchpit renewal, culvert clearance, and the CCTV survey that decides which one is needed.

07
Protection

Our own controllers of site safety and our own lookouts, so protection is never a hired dependency.

03

Slide 3 · pillars · The capability map itself: seven disciplines a buyer can tick against a framework lot.

The Only Number That Counts

Possessions worked in the year to March 2026, and the ones we did not hand back on time.

412

Possessions worked

Across six routes in the year to March 2026. Ninety one of them were on switch and crossing renewals.

3

Handed back late

Two for a failed tamper, one for a cable strike we caused. All three are written up in the appendix.

04

Slide 4 · metrics · The single measure this trade is actually judged on, stated as a count rather than a percentage.

Accreditations

All current as of August 2026. Certificates and expiry dates are in the appendix, not summarised here.

RISQS verified

Audited annually, all seven relevant capability codes.

ISO 45001

Occupational health and safety, certified since 2011.

ISO 9001

Quality management, certified since 2003.

ISO 14001

Environmental management, certified since 2009.

Cyber Essentials Plus

Renewed March 2026, covering the depot and site networks.

CHAS Elite

Common assessment standard, held continuously since 2014.

Sentinel sponsor

Direct sponsor for 431 track safety cards.

Plant operations

Approved for on-track machine operation on all six routes.

Living wage

Accredited employer, including agency and apprentice staff.

Prompt payment

Signatory, median subcontractor payment 21 days.

05

Slide 5 · checklist · The accreditation wall, which is what a supplier list actually screens on.

Current Workload

Sixteen live commitments as at 1 August 2026. Capacity for one further term contract from January.

Mobilising

Ryhope drainage

Cess renewal, 4.1km. Site set up September, first possession October.

Barnetby S&C

Two units. Design frozen, panels ordered, tamper booked.

Wath sidings

Ballast cleaning over five weekends from November.

Depot 7 fit out

New Leeds satellite depot, operational from December.

On site

Doncaster plain line

Rail renewal, 12 of 19 possessions worked, all handed back early.

Chesterfield S&C

Three units, one remaining. Longest possession is 54 hours.

Selby undercut

Ballast cleaning train working nights, 2.8km of 4.4km done.

Route 4 maintenance

Term contract, year 3 of 5. Reactive attendance inside 4 hours.

In maintenance

Trans Pennine east

Term maintenance, 214 track miles. Renewed to 2029.

Humber freight branch

Inspection and reactive works, 41 miles, since 2018.

Aire valley

Drainage maintenance only, 88 catchpits on a two year cycle.

Depot trackwork

Four depots on an annual inspection and repair call off.

Closed 2026

Goole S&C

Four units renewed over two Christmas blockades. Handed back 6h early.

Knottingley renewal

2.2km plain line. Completed March, defect free at 12 week check.

Thorne culverts

Nine culverts cleared and lined. Finished under the target cost.

Hull survey

Geometry survey and renewal design for 31 track miles.

06

Slide 6 · process · Current workload, which tells a buyer whether the firm has capacity before they ask.

Against The Framework Dimensions

Our own scoring against the six dimensions in the 2026 supplier assessment, with the pass mark shown.

Safety
Delivery
Plant
Design
Drainage
Digital
0255075100
Bramwell
Framework minimum

WHERE WE WIN AND WHERE WE DO NOT

SAFETY

Twenty two points clear of the minimum. Zero RIDDOR events across 41,000 shifts since 2022.

DELIVERY

Eighteen points clear. 409 of 412 possessions handed back on or before time last year.

PLANT

Owning three ballast cleaning trains is why this sits at 84 rather than in the sixties.

DESIGN

Eleven points clear, no more. Our design team is nine people and that is the ceiling.

DRAINAGE

Sixteen points clear. Growing, but we still hire in CCTV survey rather than own it.

DIGITAL

Two points below the minimum. Our asset data is not yet in the common data environment.

07

Slide 7 · metrics · Scores the firm against the assessment dimensions a rail framework actually uses, including where it is weakest.

Plant We Own

Forty one items of on-track and road rail plant, all owned outright, average age six years.

Renewal

Ballast cleaners

Three trains, one of them a high output undercutter.

Tampers

Four, two with dynamic track stabiliser fitted.

Regulators

Three ballast regulators on a shared rota.

Stressing

Six rail stressing sets and two flash butt welders.

Road rail

Excavators

Eleven road rail excavators, 8 to 22 tonne.

Attachments

Forty two attachments including four rail lifters.

MEWPs

Two rail mounted platforms for OLE adjacent work.

Trailers

Nine rail trailers for panel and spoil movement.

Survey

Trolleys

Six geometry trolleys, calibrated quarterly.

Scanning

Two laser scanners for clearance and structures.

Drainage CCTV

Hired in. The one gap in the owned list.

GPR

One ground penetrating radar unit for ballast depth.

Depots

Doncaster

Head office, plant workshop, 6 acre stockyard.

Middlesbrough

Crew base and welfare, 41 staff, rail connected.

Preston

Trans Pennine west crew base opened 2023.

Leeds

Satellite depot, operational from December 2026.

People

Track staff

288 directly employed, none through agencies.

Machine operators

64 operators, all cross trained on two machine types.

Designers

Nine, in house, doing our own renewal design.

Apprentices

Twenty two on a four year track engineering scheme.

08

Slide 8 · framework · The plant list, because in this trade owning the machine is the capability.

Comparable Contracts

Seven contracts of similar scale and type in the last five years, with the referee named in the appendix.

Trans Pennine east term maintenance, 214 track miles, £14.2m a year, renewed to 2029.

Goole S&C, four units across two Christmas blockades, handed back six hours early.

Selby undercutting, 4.4km, delivered inside a fixed price with no compensation event.

Thorne culverts, nine structures cleared and lined, finished 4 percent under target cost.

Hull geometry survey and renewal design, 31 track miles, adopted without amendment.

Route 4 reactive maintenance, three years, median attendance on site 3 hours 10 minutes.

Knottingley renewal, 2.2km plain line, defect free at the twelve week geometry check.

09

Slide 9 · content · Comparable contracts as evidence, each with the one number a buyer would ring the referee about.

From Award To First Possession

STAGE 01

Set Up

Two weeks. Depot allocated, Sentinel sponsorship transferred, protection arrangements agreed with the route.

STAGE 02

Survey

Three weeks. Our own geometry trolleys and designers. No survey is taken on trust from an incumbent.

STAGE 03

Plan

Four weeks. Possession bids submitted, plant booked, and a handback time agreed for every one of them.

STAGE 04

Work

First possession in week ten. It is deliberately a small one, so the first thing we prove is the handback.

10

Slide 10 · checklist · What actually happens between award and the first possession, which is the buyer real question.

CAPABILITY STATEMENT 2026

BRAMWELL RAIL SERVICES

Assess us.

We are not asking for work in this document. We are asking to be assessed, and we would rather that assessment happened on a Tuesday than in the middle of a bid.

WHO TO CONTACT

suppliers@bramwellrail.example

Ellis Carrow, 01302 447 200

Bramwell Rail Services

DONCASTER · EST. 1997

Slide 11 · closing · Ends with the request a capability statement is actually making, which is assessment rather than a job.

The structure

What each slide is doing, so you can reuse the order even with different content.

Slide 1cover
States what the document is and the two facts a category manager screens on first.
Slide 2intro
One paragraph on who the firm is, with the three commitments the rest of the deck has to evidence.
Slide 3pillars
The capability map itself: seven disciplines a buyer can tick against a framework lot.
Slide 4metrics
The single measure this trade is actually judged on, stated as a count rather than a percentage.
Slide 5checklist
The accreditation wall, which is what a supplier list actually screens on.
Slide 6process
Current workload, which tells a buyer whether the firm has capacity before they ask.
Slide 7metrics
Scores the firm against the assessment dimensions a rail framework actually uses, including where it is weakest.
Slide 8framework
The plant list, because in this trade owning the machine is the capability.
Slide 9content
Comparable contracts as evidence, each with the one number a buyer would ring the referee about.
Slide 10checklist
What actually happens between award and the first possession, which is the buyer real question.
Slide 11closing
Ends with the request a capability statement is actually making, which is assessment rather than a job.

What makes this deck work

It shows the weakness on the chart

The radar puts the firm two points below the framework minimum on digital maturity, and the sidebar says so in words. A supplier list assessment tests whether you know your own gaps, and volunteering one makes the other five scores readable.

Current workload answers capacity

Sixteen live commitments arranged by stage, ending with capacity for one further term contract from January. Buyers screening a supplier list want to know whether the firm can take the work before they care what it does.

Owning the plant is the capability

Forty one items listed by category, including the one line that says drainage CCTV is hired in. In this trade the machine is the differentiator, so a list of owned assets carries more weight than a page of adjectives.

Questions people ask

What must a capability statement include?

Core competencies in the buyer own vocabulary, the registration codes and identifiers they screen on, accreditations and insurance, past performance with contactable referees, delivery footprint and capacity, and a named contact. Government buyers in several countries require one before they will hold a meeting.

What is the difference between a capability deck and a capability statement?

The statement is conventionally one page, designed to be left behind or emailed. The deck is its expanded form and follows the same section order rather than a narrative arc, which is why this example reads as a reference document instead of a story.

Should a capability deck include prices?

No. It is sent before a specific requirement exists, so a price would be invented. This example carries no rate card and no offer, and its closing slide asks to be assessed rather than to be given work.

How do I get on a company approved supplier list?

Most large buyers run a prequalification questionnaire. In UK construction the industry agreed set is the Common Assessment Standard, mandated by procurement policy note and delivered at two certification levels by a handful of recognised assessment bodies. Send the capability document, then ask which questionnaire applies.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make my capability deck