Electrical contractor agreement, Rye Lane Cafe rewire

Electrical contractor agreement with a licence clause and staged payments

Electrical work is the one trade where the paperwork at the end matters as much as the work, because without the certificate the installation is not signed off. This agreement ties the last payment stage to that certificate and sets the progress claim deadlines the payment legislation actually uses.

Create a document with OneCraft6 A4 pages, editable, then download as a PDF

The document, page by page

Every page as it renders and as it prints, with nothing summarised. Read the wording before you reuse it.

Electrical contractor agreement

Rewire and Fitout, Rye Lane Cafe

Between Halvard Hospitality Pty Ltd and Voltwise Electrical Pty Ltd

Voltwise Electrical Pty Ltd, REC 24118
Works commencing 19 October 2026
Electrical contractor agreement · Rye Lane Cafe · contract EL-2026-88Page 2 of 6
Electrical contractor agreement · Rye Lane Cafe · contract EL-2026-88Page 3 of 6
Electrical contractor agreement · Rye Lane Cafe · contract EL-2026-88Page 4 of 6
Electrical contractor agreement · Rye Lane Cafe · contract EL-2026-88Page 5 of 6
Electrical contractor agreement · Rye Lane Cafe · contract EL-2026-88Page 6 of 6
Parties

This agreement is made on 2 October 2026 between Halvard Hospitality Pty Ltd, ABN 71 336 905 224, of 4 Rye Lane, Brunswick VIC 3056, called the Client, and Voltwise Electrical Pty Ltd, ABN 28 550 771 306, Registered Electrical Contractor licence REC 24118, of 22 Dawson Street, Coburg VIC 3058, called the Contractor.

$38,600
Contract sum
30 / 40 / 30
Payment stages
19 Oct 2026
On site
12 months
Defects period
1. The works
1.1
Scope
A full rewire of the tenancy at 4 Rye Lane and the electrical fitout of the new kitchen and counter, carried out to AS/NZS 3000 and the drawings listed in clause 1.2. The tenancy trades through the works, so power to the existing front of house is kept live except during the two agreed shutdowns.
1.2
Drawings
The works are those shown on drawings E-01 switchboard and submains, E-02 power and data layout, E-03 lighting layout and E-04 kitchen equipment schedule, all revision C dated 18 September 2026. Where a drawing and this agreement disagree, this agreement prevails.
1.3
Exclusions
Data and telephone cabling, the fire panel, the refrigeration mechanical work, the supply authority connection fee, patching and painting after chasing, and any asbestos found in the existing ceiling. Each is either by others or quoted separately.
1.4
Licensed work only
All electrical installation work is carried out by or under the supervision of a licensed electrician, and the Contractor holds and keeps current its Registered Electrical Contractor registration for the whole of the works. The registration number appears on every invoice and on the certificate issued under clause 5.
2. Price and payment
2.1
Contract sum
The contract sum is $38,600 plus GST, fixed for the scope in clause 1. It includes all labour, materials, the switchboard, testing, the certificate and one return visit for commissioning after the kitchen equipment lands.
Stage
Claimable when
Share
Amount
1
Rough in complete, submains run, switchboard set
30%
$11,580.00
2
Fit off complete, lighting and power live
40%
$15,440.00
3
Testing, commissioning and certificate issued
30%
$11,580.00
Total before GST
100%
$38,600.00
GST at 10 percent
$3,860.00
Total including GST
$42,460.00
2.2
Progress claims
Each stage is claimed by a payment claim that states it is made under the Building and Construction Industry Security of Payment Act 2002 (Vic). The Client pays the claimed amount or issues a payment schedule saying why less is payable, within 10 business days of the claim. Payment is due within 15 business days of a valid claim. No retention is held, but stage 3 is not claimable until the certificate under clause 5 is in the Client's hands and the defects list from the walkthrough is cleared or agreed in writing.
A payment schedule is not optional
If the Client wants to pay less than a payment claim asks for, it has to say so in a payment schedule inside the time allowed and give reasons. Staying silent is not a defence later, which is why clause 2.2 sets the deadline in business days rather than as soon as practicable.
3. Variations
3.1
In writing, before the work
A variation is priced and agreed in writing, including by email, before the work is done. Work carried out without a written variation is not payable, and the Contractor does not proceed on a verbal instruction from anyone on site.
Rate item
Unit
Rate
Licensed electrician
Hour
$102.00
Apprentice, third year or later
Hour
$56.00
After hours and weekend loading
Hour
$153.00
Materials
Cost plus
12%
3.2
Concealed conditions
The existing ceiling and wall cavities have not been opened. If the Contractor finds unsafe existing wiring, asbestos or a structural obstruction, it stops that part of the work, tells the Client the same day, and prices the extra as a variation before continuing.
4. Programme, site and safety
4.1
Programme and shutdowns
On site from 19 October, rough in complete by 6 November, fit off complete by 27 November, commissioning by 4 December. The two power shutdowns are booked for Monday 26 October and Monday 23 November, each from 6 am to 11 am, and are confirmed with the Client five business days ahead.
4.2
Site and safety
The Client gives clear access to the tenancy, the meter room and the roof space during working hours and keeps the area free of stock during the shutdowns. The Contractor works under the Occupational Health and Safety Act 2004 (Vic), prepares a safe work method statement for any high risk work including work at height and live testing, and isolates and tags every circuit it works on. No one else works in an isolated area while a tag is on.
5. Certificate and handover
5.1
Certificate of Electrical Safety
Within five business days of completing the works the Contractor tests the installation and issues a Certificate of Electrical Safety for the prescribed work, with the results of the mandatory tests recorded on it. The Client cannot be asked to pay stage 3 before it has that certificate.
5.2
What is handed over
A marked up as built copy of E-01 to E-04, the switchboard schedule with every circuit labelled, the test results, the manuals and warranty cards for the light fittings and the switchgear, and a written list of which circuits feed which kitchen equipment.
6. Defects and warranties
6.1
Defects period
The defects period is 12 months from the date on the certificate. A defect notified in that period is attended within two business days and rectified within ten, at the Contractor's cost, including making good any surface it has to open.
7. Insurance, ending and disputes
Policy
Minimum cover
Held by
Public liability
$20 million
Contractor
Workers compensation
As required by law
Contractor
Tools and plant
Own risk
Contractor
Building and fitout works
Full replacement
Client
7.1
Certificates and suspension
Each party gives the other a certificate of currency for its policies before work starts and within five business days of any renewal during the works. If a payment is more than 10 business days late and no payment schedule was issued, the Contractor may suspend the works on two business days written notice and is entitled to the reasonable cost of demobilising and returning.
7.2
Ending the agreement
Either party may end this agreement if the other is in serious breach and has not fixed it within 10 business days of written notice, or becomes insolvent. On termination the Contractor is paid for work properly carried out to that date, including materials already on site.
7.3
Disputes
The parties meet within five business days of a dispute being raised. A payment dispute may go to adjudication under the security of payment legislation at any time. Anything else goes to mediation before proceedings, and this agreement is governed by the law of Victoria.
For Voltwise Electrical Pty Ltd, REC 24118
Name
:
Position
:
Date
:
For Halvard Hospitality Pty Ltd
Name
:
Position
:
Date
:

Section by section

What each section is for, so you can keep the ones you need and drop the rest.

Cover
A contract cover naming the job, both companies and the contractor's registration number.
Parties and key terms
Legal names, ABNs, the registration number, then the sum, stages and defects period.
1. The works
Scope, the four drawings by revision, exclusions and the licensed work clause.
2. Price and payment
The $38,600 sum, the staged payment table to $42,460 including GST, and progress claims.
3. Variations
Changes in writing before the work, a rate table, and concealed conditions.
4. Programme, site and safety
Dates, the two booked shutdowns, access, and safe work method statements.
5. Certificate and handover
The Certificate of Electrical Safety and the marked up drawings and schedules handed over.
6. Defects and warranties
A 12 month defects period, AS/NZS 3000 compliance and consumer guarantees.
7. Insurance, ending and disputes
Four policies with who holds each, suspension for non payment, termination and adjudication.
Signatures
A block for the contractor carrying its registration number and one for the client.

Clauses in this document

How to adapt this agreement

For a domestic rewire rather than a commercial fitout, replace the drawing list with a room by room scope, drop the trading hours and shutdown clauses, and add the statutory home building warranties that apply to residential work in your state. For a maintenance arrangement rather than one job, replace the staged payment table with a call out fee and an hourly rate, and swap the defects period for a response time. For a job under the threshold where security of payment does not help, cut clause 2.2 back to a plain 14 day term and keep the rest, because the certificate link in clause 5.1 is doing most of the work.

Which law the terms follow

The agreement sits in Victoria, so the payment clause runs on the Building and Construction Industry Security of Payment Act 2002 and the certificate is the Certificate of Electrical Safety that a registered electrical contractor issues for prescribed work. Safety duties come from the Occupational Health and Safety Act 2004, which is why work at height and live testing each need a safe work method statement before they start. The installation is built to AS/NZS 3000, consumer guarantees under the Australian Consumer Law apply to the goods and services and are not limited, and GST is added at 10 percent on a tax invoice carrying the contractor's ABN and registration number.

What makes this document work

The last payment waits for the certificate

Stage 3, being $11,580 of the $38,600, is not claimable until the Certificate of Electrical Safety is in the client's hands. That one link turns a piece of compliance paperwork into something the contractor has a reason to finish on time.

The payment schedule deadline is in business days

Clause 2.2 gives the client 10 business days to issue a payment schedule and 15 to pay a valid claim. A warning callout explains that staying silent is not a defence, which is the part most people get wrong.

Variations are priced before anyone opens a wall

A four row rate table sets $102 an hour for an electrician, $56 for an apprentice, $153 after hours and materials at cost plus 12 percent, so the concealed conditions clause has real numbers behind it.

Questions people ask

What should an electrical contractor agreement include?

The scope by drawing, who is licensed to do the work, the contract sum and how it is claimed, variation rates, the programme and any shutdowns, safety, the certificate issued on completion, the defects period and insurance. All of those are numbered clauses here.

Does an electrical contract need the licence number in it?

It should. This agreement puts the contractor's registration number on the cover, in clause 1.4, on every invoice and in the signature block, so anyone reading it can check the register. Clause 1.4 also requires the registration to stay current for the whole of the works.

What is a Certificate of Electrical Safety?

It is the document a licensed electrical contractor issues for prescribed electrical installation work, recording the mandatory test results. Clause 5.1 requires it within five business days of completion, and makes the final payment stage conditional on the client holding a copy.

How do staged payments work on an electrical job?

The contract sum is split against milestones anyone can verify. Here it is 30 percent at rough in, 40 percent at fit off and 30 percent at testing and certificate, each claimed by a payment claim rather than invoiced on a date.

What are progress claims under security of payment?

A payment claim states that it is made under the relevant state Act. The party receiving it either pays in full or issues a payment schedule inside the statutory period saying why less is payable. Missing that deadline usually means the claimed amount becomes payable.

Who pays if asbestos is found in the ceiling?

Not the contractor. Clause 3.2 says unsafe existing wiring, asbestos or a structural obstruction stops that part of the work, is reported the same day, and is priced as a variation before anything continues. Asbestos removal is also listed as an exclusion in clause 1.2.

Build your own in about a minute

The button below opens the generator with this use case already described. Change the wording to match your own, generate, then edit anything you like.

Make my electrical contractor agreement with a licence clause and staged payments